Scenario for Task 1 only
You are an assistant quantity surveyor working for a large quantity surveying practice called PHR Associates. You are working with your manager on the preparation of tender documents for a project to construct a new private boarding school for a client who is new to the construction industry. As part of the project the school is also building two houses to accommodate staff that will be working at the school.
You are currently working on the substructure for one of the houses on the project. The drawings
include plans, sections and details, with some specification details, further specification is provided
below.
As part of the traditional procurement route, you have been asked to take-off quantities for selected
substructure items for House A to progress the preparation of tender documents.
Assessment Task 1
Your director has asked you to take off quantities for selected items of construction works for House
- A take-off template including a query sheet is available on the VLE. You should use this template to complete your take-off. You should ensure that you have completed all the tabs of the template.
Using a Standard Method of Measurement (SMM) and following the traditional method of
measurement, take-off quantities for the following substructure items as shown on the drawings:
- D0752 GF Plan
- D0753 FF Plan
- D0759 Cross Section
- D0760 Section GF details
- D0761 Section FF details
- D0763 Section roof details.
List of items to be measured:
- Topsoil excavation
- Topsoil retention
- Reduced level excavation
- Disposal of excavated material
- External trench excavation
- Concrete in trench foundation
- Disposal of excavated material
- Brickwork to outer layer of cavity wall below DPC (up to DPC level)
- Brickwork to inner layer of cavity wall below DPC (up to DPC level).
Your submission should include:
- A taking off list
- Marked up drawings
- A query and answer sheet
- Measurement in the traditional format.
Specification
600mm wide x 1500mm deep C20 mass concrete foundation footing. Taken down to 2.2m below structural floor level.
Walls below ground 100mm semi engineering brick outer leaf. 100mm standard dense concrete
block inner leaf bedded in 1:3 cement mortar.
Notes
Assume the construction of the walls below ground is the same all the way around the building.
A bill of quantities is not required.
Excellent – Excellent submissions should provide the following in addition to the ‘Good’ requirements
Task 1
- Clear, accurate and excellent presentation of dimensions and waste calculations with no errors in dimensions or waste calculations.
- Completeness of measure with no items missed, but slight computational errors.
- Excellent use of the Q and A sheet to progress the measurement of the identified items.
- Drawings clearly and neatly marked up to indicate the items to be measured.
- Measured items accurately and completely described according to the SMM.
- Ability to interpret the drawings and understand the specification for all items that need to be measured.
Reference
D0763 Section Roof Details (1).pdf
Get Human-Written Quantity Surveying Assignment Help
In practice, NRM2 quantity surveying assignments like this require accurate take-off, correct use of SMM rules, and clear interpretation of drawings and specifications. Many TU Dublin students struggle with substructure measurement, waste calculations, and presenting quantities in the traditional format. If you’re facing similar challenges in Quantity Surveying Assignment Help Ireland, expert academic support can save time and reduce errors. At Ireland Assignments, we provide TU Dublin Assignment Help that is AI-free (0%) and plagiarism-free, aligned with 2026 QS marking criteria. Our reliable assignment samples help students submit precise, well-presented work with confidence.